# Cycle Rates and Item Rates

A run's standard rate, the rate OEE performance is measured against, comes from the tool mounted on the machine. Most tools
need only a **cycle rate**; an **item rate for a tool** is an exception for an item that runs at a different speed.

## Cycle Rates

The **cycle rate** is how many times a minute or an hour a machine cycles with the tool mounted: its ideal speed with that
tool (shots, strokes). It's set per machine, on the tool editor's **Cycle Rates** tab, because the same tool can run faster on
one machine than another. Only the machines in the tool's site that use tooling are offered.

![Cycle Rates tab](https://docs.kanoa.ai/img/tooling/tool-editor-cycle-rates.png)

The standard rate for an item is:

> **cycle rate x parts per cycle x package count**, counting the positions set to the item or to no item (blocked
> positions count, retired ones don't)

Parts per cycle are counted in the item's **outfeed** units: the parts a cycle makes. A machine's standard rate is in its
**infeed** units, so the **Package Count** of the machine's own rate for the item (in
[Production Rates](../items/item-rates.md): the infeed units that make one outfeed unit) converts one to the other. When
the machine counts the same thing going in and coming out, the package count is 1 (or empty) and drops out.

For example, Mold M-100 has 4 cavities with no item, and runs at 15 cycles a minute on Machine 2. Whatever item runs, its
standard rate is 15 x 4 = 60 a minute. A family mold with cavities 1-2 set to item A and 3-4 to item B at 12 cycles a minute
gives each item 12 x 2 = 24 a minute.

A machine that measures what goes in rather than parts works the same way. Machine 1 machines parts from bar, rated in pounds
of bar in, with a package count of 0.1 (each part takes 0.1 lb). A 4-nest fixture at 10 cycles a minute gives
10 x 4 x 0.1 = 4 lbs a minute.

A mold base with inserts uses its own cycle rate on the machine if it has one; otherwise the slowest cycle rate of the
inserts mounted in it.

:::tip
The cycle rate is a target, not a count. What was actually made still comes from the machine's counts.
:::

## Item Rates for a Tool

Set an item rate for a tool when an item's rate isn't simply the cycle rate times its parts per cycle, for example when it
runs slower than the tool's other items. Item rates for a tool live with the machine's own item rates, in
**Configuration > Ops > Materials**, on the [Production Rates](../items/item-rates.md) tab:

1. Select the machine's rate for the item (its **Tool** column says *Machine rate*) and click the edit button.
2. In the editor, pick the **Tool**. The list has the tools that can be mounted on the machine, and *None*, the machine's
   own rate; a tool that already has a rate says *(has a rate)*, and picking it edits that rate. A tool with no rate starts
   a new one from the machine's rate's units and period, and a hint says what the tool's cycle rate already gives the
   item, so you can tell whether you need a rate here at all.
3. Enter the standard rate (and schedule rate) and click **Save**.

![Item Rate Editor with the Tool field](https://docs.kanoa.ai/img/item-config/item-rate-editor-tool.png)

Tool rates are listed under the machine's own rate in the Production Rates table, with the tool in the **Tool** column, and
are edited (select one and click the edit button) and deleted like any other rate. The **Tool** column only shows when a
listed machine uses tooling.

## Which Rate a Run Uses

When a run (an item running on a machine) starts, or the tooling on the machine changes, its standard rate is the first of:

1. **The item's rate for the mounted tool** (for a mold base with inserts, the innermost tool that has one).
2. **The tool's cycle rate x parts per cycle x package count**, when the mounted tools make at least one part of the item per cycle.
3. **The machine's own rate for the item**.

So a tool with no cycle rate, or whose positions are all set to other items, leaves the machine on its own rate.

- Mounting, unmounting, or retiring a position starts a new run at that moment if it changes the rate. Blocking a position
  never does.
- Each run keeps the rate it started with. A changed rate applies to the run in progress and later runs, never to earlier
  ones. A rate override typed on a run is kept through rate changes.
- Deleting a rate the run in progress is using re-stamps that run with the rate that applies now.