# Tool Life

Each tool counts the cycles and running time it has done, against the limits set on its **Details** tab, and gets a status
from them. The tool editor's **Life** tab shows the counts beside the limits and records maintenance.

![Life tab](https://docs.kanoa.ai/img/tooling/tool-editor-life.png)

## Counts

| Count | Meaning |
| --- | --- |
| Lifetime | Everything the tool has done. |
| Since PM | Since the last preventive maintenance. |
| Since refurbishment | Since the last refurbishment. |
| Refurbishments | How many times it has been refurbished. |
| Calibration | When it was last calibrated, and when it's next due. |

Each count has **cycles** and **run minutes**; **Used (life unit)** is the one in the tool's life unit, which the limits are
measured in.

- **Cycles** come from the machine the tool is mounted on: its cycle count input, or its outfeed count divided by the parts
  per cycle. A tool with its own shot counter reports its readings through the machine's tags instead.
- **Run minutes** are the time the machine was *Running* while the tool was mounted.
- A back-dated mount or a corrected mount window moves the counts for that time onto (or off) the tool.

## Statuses

| Status | When |
| --- | --- |
| Available | Not mounted, within its limits. |
| Mounted | On a machine or in a pocket. |
| Due for PM / Due for refurbishment / Due for calibration | When the tool has **used** its **Warn at %** of that limit. With a PM interval of 20,000 cycles and Warn at 90%, that's after 18,000 cycles, with 2,000 left. |
| Over limit | Past a limit (PM interval, refurbishment interval, lifetime, max refurbishments or calibration date). |
| In repair, Damaged | Set by hand. The tool can't be mounted. |
| Retired | Set by hand or by retiring the tool. The tool can't be mounted. |

Statuses are updated as counts come in, and the gateway checks every tool's limits every hour, including calendar-day and
calibration limits that pass with no counting at all. Tools that are due or over a limit appear in the tools list's
**Alert** column, on the machine's info panel (the **Tooling** and **Notifications** cards), and in the Event Notifications
widget.

## Recording maintenance

- **PM done** sets the since-PM counts to 0 and stamps the PM date.
- **Refurbished** sets the since-refurbishment counts to 0, stamps the date and adds one refurbishment.
- **Calibrated** stamps the calibration date and moves the next due date on by the calibration interval.
- **Rebuild counts** recomputes the counts from the machine's history over every time the tool was mounted.
- **Correct a count** changes one count by hand, for example to set a used tool's starting lifetime.
- **Set status** marks the tool *In repair*, *Damaged* or *Retired*, or clears that so it goes back to the status its
  limits and mount give it.

Add a **Note** (a work order number or reason) before clicking; every change is logged with it as an adjustment.

## With Kanoa Maintenance

Tooling tracks a tool's life and records its maintenance on its own; Kanoa Maintenance isn't needed. With a Kanoa
Maintenance license, the work can be scheduled as maintenance work orders instead:

1. In Kanoa Maintenance, create a work order template set to **Condition**, with the tool as its **Asset**.
2. Pick the **Tool Life** condition and set **Due for** to the PM, refurbishment or calibration limit.
3. When the tool reaches its **Warn at %** of that limit, a work order is created. Completing it resets that count, the
   same as **PM done**, **Refurbished** or **Calibrated** on the Life tab.

The tool editor's **Maintenance** tab lists the tool's maintenance work orders; double-click one to open it. See [Work
Order Creation & Scheduling](../../kanoa-cmms/workOrderTemplate.md).