# Trigger and Notify

A **Mode Change** trigger issues a check when an asset enters a mode. The production run supplies both the asset and the item, which fills in the context the FAI requires.

:::action[Add the mode-change trigger]

1. Open `Machining - First Article Inspection` and go to the **Triggers** tab.
2. Add a trigger of type `Mode Change` with mode `Production`.
3. Set Delay `5`, Coming Due `5`, Over Due `5` and Grace `5` minutes.
4. Save and release the check sheet.

:::

::embed-section{src="../../../kanoa-quality/checkSheets.md#trigger-types" collapsed="true" summary="Reference Materials: Trigger Types"}

An automatic check only helps if the operator sees it. The **Event Notifications** widget lists checks that are due, and uncoded downtime, and opens them with one click.

:::download[Quality notifications dashboard]
<a href="/files/quality-resources/asset-quality-notifications-dashboard.json" download><code>asset-quality-notifications-dashboard.json</code></a>: the `Asset Quality and Notifications` dashboard, with Event Notifications, a date range selector, and an Asset OEE Bar Chart showing the Quality metric.
:::

:::action[Set up the operator dashboard]

1. Open the dashboard editor and import `asset-quality-notifications-dashboard.json`. It's created as `Operator Dashboards\Asset Quality and Notifications`.
2. Open `Machine 1`'s operation page, choose `Asset Quality and Notifications` in the dashboard selector, and make it the asset's default, as you did in [Starting Production](../../4-training-ops/01-base-configuration/4-starting-production.md).

:::

:::action[Trigger and complete an FAI]

1. In Run Control for `Machine 1`, set the mode to `Changeover`, select `SC-2024` on the **Product** tab, and click **Start Run**. The machine enters Production.
2. After the 5-minute delay, an FAI appears in Event Notifications. Click it to open Active Checks with Machine 1 selected.
3. Open the FAI and confirm the asset and item are filled in.
4. Enter three diameters near 25 mm, two lengths, and a visual result, then submit.
5. Complete a second FAI on another machine. Trigger a third and leave it unfinished, so the next lesson has some late checks to analyze.

:::

:::download[Finished check sheet]
<a href="/files/quality-resources/check-sheet-machining-first-article-inspection.json" download><code>check-sheet-machining-first-article-inspection.json</code></a>: the finished FAI check sheet, including the `FAI Diameter` tolerances, to compare with your build.
:::