# Analyze Maintenance

Every work order leaves timestamps behind. **Maintenance Analytics** turns them into KPIs, so you can manage maintenance on
data. This lesson reads them in three groups.

## Open the Dashboard

1. Open **Maintenance → Maintenance Analytics**.
2. Select a date range and an area or asset, such as the `Machining` area.

![The maintenance KPIs](https://docs.kanoa.ai/img/cmms/kpis.png)

{/*
TODO: Confirm on a gateway the filters on the Maintenance Analytics screen (date range and asset or area selectors).
The Developer Training selects today and the Machining area.
*/}

## Response and Reliability

| KPI | Measures | Read it this way |
| --- | --- | --- |
| MTTA | Created to first response | High means work waits before anyone picks it up |
| MTTR | Start to completed | High means jobs are slow once started |
| MTBF | Average time between failures for an asset | Low means the asset fails often |
| Schedule Compliance | Work orders completed on or before their due date | Falling means planned work is slipping |

```text
Schedule Compliance (%) = Work Orders Completed On Time / Total Work Orders Completed
```

The docs call the PM measure **Schedule Compliance**. It covers all work orders, not only PM.

![MTBF by asset](https://docs.kanoa.ai/img/cmms/mtbfChart.png)

The **MTTR / MTTA Trend** chart shows whether response and repair are improving. **Workflow Churn** shows work orders moving
back between states, such as Open → In Progress → Open. High churn can mean rework, poor planning or interruptions.

![Workflow churn](https://docs.kanoa.ai/img/cmms/workflowChurn.png)

## Backlog

1. Find **Work Order Flow**: created, completed and open work orders over time.
2. Find **Backlog Aging**: open work orders grouped as 0-7, 8-30, 31-60 and 60+ days.
3. Switch to the stacked view, which splits the aging by maintenance type and by priority.

| If you see | It means |
| --- | --- |
| Created higher than completed | The backlog is growing |
| Completed higher than created | The backlog is shrinking |
| Preventive work in the older buckets | PM is being deferred |
| High-priority work in the older buckets | Urgent work is being neglected |

![Backlog aging](https://docs.kanoa.ai/img/cmms/backlogAgingChart.png)

{/*
TODO: Confirm on a gateway how the stacked view of Backlog Aging is switched on and how its segmentation by maintenance
type and by priority is chosen.
*/}

## Labor

1. Find the **Labor Hours** KPIs: technician hours, procedure step hours and total labor hours.
2. Compare them with **Avg Time Active** and **Avg Time To Complete**.
3. Open **Labor Hours by Technician**, a bar chart of the top 10 technicians by hours logged.
4. Use the **Maintenance Work Order Hours** table to trace a number back to its work orders.

Logged labor and elapsed time are reported separately on purpose. A work order open for days with only an hour logged is
waiting, not being worked.

::embed-section{src="../../kanoa-cmms/cmmsAnalytics.md" collapsed="true" summary="Reference Materials: Maintenance Analytics - Every KPI and chart."}

## Check Your Understanding

1. Which KPI measures how fast work is picked up, and which how fast it's completed?
2. The Created line sits above Completed on Work Order Flow. What does that mean?
3. How is Total Labor Hours made up?

<details>
<summary>Answers</summary>

1. MTTA measures how fast work is acknowledged. MTTR measures how fast it is completed once started.
2. The backlog is growing.
3. Technician Hours plus Procedure Step Hours.

</details>
