Schedule a Check Sheet
A check sheet does nothing until something schedules it. A trigger tells Kanoa when to schedule it, such as at a shift change or when a new product starts. Timers decide how long inspectors have to start the check. This lesson shows you how to set both.
Changing triggers needs the Configure Quality security function. On a released check sheet, you change triggers through a revision. See Release and Revise.
Add a Trigger
- Open Configuration → Quality → Check Sheets and open the check sheet.
- Go to the Triggers tab.
- Click the + button to add a trigger, or the edit button to change one.
- Choose the trigger type, set its options and timers, and save.


You can add more than one trigger. A check sheet with no trigger can still be scheduled by hand.
Choose a Trigger Type
| Trigger | When it schedules the check sheet |
|---|---|
| Manual | Only when someone adds the check. It sets how long the inspector has to take it. |
| Mode Change | When an asset changes mode, such as Changeover to Production. An optional From Mode limits it. |
| Product Change | When the running product changes. |
| Shift Change | When the current shift matches the trigger's shift settings. |
| Timed Interval | Periodically, based on the mode and shift settings. |
| Recurring | On a repeating calendar rule, such as every weekday at 6:00. Times use the asset's site time zone. |
| State Change | When an asset has been in a chosen state for at least the minimum time. |
| Infeed Count, Outfeed Count, Waste Count, General Count | Every n counts of that counter. |
| Re-Test | When a check sheet is scheduled because a re-test is needed. |
A Product Change trigger has three options:
- Every Product requires a check every time the product changes.
- Unique Products Per Shift requires a check once per product per shift.
- Once Per Shift requires one check per shift.
A trigger that fires while the check sheet is already scheduled aborts the old one if it hasn't been started, and creates a new one.
Set the Timers
Each trigger has four timers, all in minutes.
| Timer | What it does |
|---|---|
| Delay | Time between the trigger firing and the check sheet being scheduled. Until it passes, no screen shows the check. |
| Coming Due | How long a scheduled check shows as upcoming before it becomes due. |
| Over Due | How long the inspector has to start the check once it is due. |
| Grace | How long the check stays over due before it is Missed. |
A check that nobody starts moves through these statuses on its own:
In Delay → Coming Due → Due → Over Due → Missed
It is In Delay only when the trigger has a Delay. A Missed check shows on compliance reports.
A common use of Delay is a shift-change trigger, so the incoming shift has time to settle before checks appear.
Use the Manual Trigger
A check that an inspector adds with Add Check is Due as soon as it's added, so Delay and Coming Due don't apply. Only the Manual trigger's Over Due and Grace do.
For example, with Over Due 30 and Grace 30, a manual check is Over Due after 30 minutes and Missed after 60. The
sample Receiving Inspection uses this.
State Change and the count triggers are checked by a timer on the gateway. A check can be scheduled up to one timer interval after the state or count is reached.
Check Your Understanding
- An inspector adds a check by hand. Which timers apply to it?
- Which timer decides when a check becomes Missed?
- Why would you add a Delay to a shift-change trigger?
Answers
- Only Over Due and Grace from the Manual trigger. Delay and Coming Due don't apply.
- Grace. It is how long the check stays over due before it is Missed.
- So the incoming shift has time to settle before checks appear.