Operations Supervisor
As an operations supervisor, you spend your shift looking at how the plant is doing and deciding what needs your attention. Kanoa MES shows you the floor live, and it keeps the history so you can see where time and output were lost. These lessons walk through the screens you'll use to do that.
Most of what you do here is reading. The few steps that change data need a security function, and the lesson says which one.
| Lesson | What you'll learn | Time |
|---|---|---|
| Watch the Floor Live | See every asset's mode and state, and read the Asset Operation page and marquees | 10 min |
| Find Lost Time | Read downtime and speed loss, and find the top reasons | 15 min |
| Read OEE and Production Counts | See what drove availability, performance and quality | 15 min |
| Review Operator Performance | Review operator sessions and the OLE / POLE leaderboard | 10 min |
| Follow Up on Quality | Review overdue and failed checks, and approve or reject check sheets | 10 min |
Building the schedule and assigning crews belongs to the Operations Scheduler track. This track starts when the shift is running.
Kanoa decides what you can do from your user's security functions. Operate Assets lets you start runs and set states, and Edit Operations lets you correct downtime, counts and reasons. Approving checks needs Approve Checks, and logging operators in and out needs Schedule Operations. If a button is missing for you, ask your Kanoa admin.