Work a Work Order
Each step a work order takes is recorded in its history with a timestamp. Those timestamps are what the maintenance KPIs are calculated from:
| From | To | Measures |
|---|---|---|
| Created | First response, such as Assigned | MTTA: how fast work is picked up |
| In Progress | Completed | MTTR: how fast work is done |
Assign and start the work
- In Maintenance → Work Orders, open
Machine 1 - Coolant leak. - Set Assigned To to
technician. The work order moves to Assigned. - Log in as
technician, open the work order, and click In Progress at the bottom of the panel. - Set Work Type to
Repair.
Log labor and complete the work
- Add an entry to the work order's Technicians list: technician
technician, work typeRepair, 45 minutes. - Add a second entry for yourself: work type
Inspection, 15 minutes. Two people working one job each log their own time. - Add a comment, such as
Replaced cracked coolant return hose. - Click Completed.
- Open the History tab and review each status change and who made it.
If a job can't continue, for example while waiting for parts, put it On Hold instead of leaving it In Progress. On Hold is in the waiting category, so the backlog shows the job as waiting rather than being worked.
Parts used
If you take the Kanoa Inventory training, you'll issue the replacement hose from the storeroom to this work order, so its cost and stock movement are tracked together.